|
| The Public Works Department offers the following road related services during the winter months:
- culvert steaming/cleaning General Information Road patrols are carried out each morning commencing at 4:00 am seven (7) days a week. The Town provides a residential sidewalk and windrow snow clearing service to seniors and physically challenged residents where there is no able bodied person living in the household at no cost. The snow windrow is the snow bank left across your driveway by the snowplow. Applications forms are available by clicking here. Further information on our road and sidewalk winter maintenance programs are available by calling the Public Works Department. Culvert Steaming/Cleaning Snow Plowing Arterial roads such as Main Street and the Tenth Line receive preferred services at all times. These roads are major carriers of traffic and generally connect with major Regional and/or Provincial roads. Collector roads provide access to Town arterial roads and Regional arterial roads. Examples of this type of road includes Millard Street, Stouffer Street and Hemlock Road. Local roads such as Ironwood Crescent, Sawmill Lane, Hill Country Drive etcetera, are generally the final roads to be serviced. These roads generally carry low volumes of traffic and are not intended to carry through traffic. Normal plowing operations of arterial, collector and local roads take approximately (8) hours to complete after the end of a snow storm. Generally the plowing of Arterial and Collector roads will be in progress before the plowing of local roads commence. At the beginning of a snowfall, the arterial and collector roads are salted and the local roads are sanded at hills, curves and intersections. Generally, the plowing of roads commences after the accumulation of five (5) centimeters of snow. All cul-de-sacs are plowed. Generally snow will be pushed to the centre of the cul-de-sac and will remain there until time permits clean-up or the area for snow storage becomes limited. Sanding and Salting Road sanding operations are generally carried out on local roads. Continuous sanding occurs only during freezing rain or general icy conditions. For a definition of the road classification system refer to the section on snow plowing. Snow Removal Snow removal in other locations will take place on an as needed basis. Examples include when plowed or piled snow impede the safe and efficient movement of vehicular or pedestrian traffic, blocked access to fire hydrants, creates unsafe sight distances, children are using the snow piled in cul-de-sacs as play areas. Sidewalks Generally, the plowing and sanding of sidewalks maintained by the Public Works Department commences when snow accumulations are five (5) centimeters or greater. The plowing and sanding of sidewalks are normally completed within eight (8) hours after the end of a snowfall. The Town’s criteria for determining the inclusion of sidewalks into the winter maintenance program is as follows: 1) Sidewalks located on main arterial roads; For a list of sidewalks maintained by the Public Works Department refer to By-law 2007-251-RD. Residents are reminded that By-law 2007-251-RD requires owners and occupants to remove ice and snow from sidewalks that are NOT maintained by the Town.Click Here to view By-law 2007-251-RD
|
|||||

Printable page